| Job name | Numer of DAEs | tmax (s) | Submitted | Completed | Status |
|---|---|---|---|---|---|
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 04:06:58 21/09/25 | 04:07:07 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 03:40:18 21/09/25 | 03:40:25 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 03:36:11 21/09/25 | 03:36:19 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 03:16:16 21/09/25 | 03:16:24 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 650 | 03:03:52 21/09/25 | 03:06:11 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 650 | 02:59:11 21/09/25 | 02:59:18 21/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 650 | 23:31:41 20/09/25 | 23:31:48 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 650 | 23:28:27 20/09/25 | 23:28:35 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 650 | 23:16:15 20/09/25 | 23:16:22 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 150 | 23:11:56 20/09/25 | 23:12:02 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 50 | 22:53:55 20/09/25 | 22:54:03 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 106 | 22:47:08 20/09/25 | 22:47:14 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 150 | 22:35:35 20/09/25 | 22:35:43 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 22:31:15 20/09/25 | 22:32:18 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 22:26:13 20/09/25 | 22:26:20 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 22:16:37 20/09/25 | 22:16:44 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 22:13:55 20/09/25 | 22:14:01 20/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 4000 | 21:59:44 20/09/25 | 21:59:51 20/09/25 | Finished |
|
Typical Gr/LFP 0.5C discharge simulation
▾
This simulation was labeled as private. |
70x50 + 69 + 69x50 | 0 | 10:40:50 18/09/25 | 10:40:56 18/09/25 | Finished |
|
Typical Gr/LFP 0.5C discharge simulation
▾
This simulation was labeled as private. |
70x50 + 69 + 69x50 | 1 | 10:37:00 18/09/25 | 10:37:08 18/09/25 | Finished |
|
Gr/NMC single cell (Ecker et al.) 1C discharge
▾
Ecker, M. et al. Parameterization of a Physico-Chemical Model of a Lithium-Ion Battery: I. Determination of Parameters. J. Electrochem. Soc. 162, A1836–A1848 (2015). Ecker, M., Käbitz, S., Laresgoiti, I. & Sauer, D. U. Parameterization of a Physico-Chemical Model of a Lithium-Ion Battery: II. Model Validation. J. Electrochem. Soc. 162, A1849–A1857 (2015). |
30x30 + 20 + 30x30 | 3795 | 09:36:47 13/09/25 | 09:36:54 13/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
Graphite Anode (Ecker et al.) + typical LFP Cathode. 1C discharge rate corresponds to 1 A. |
50x50 + 30 + 50x50 | 3680 | 15:41:01 12/09/25 | 15:41:09 12/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
Graphite Anode (Ecker et al.) + typical LFP Cathode. 1C discharge rate corresponds to 1 A. |
50x50 + 30 + 50x50 | 3680 | 15:04:05 12/09/25 | 15:04:11 12/09/25 | Finished |
|
Typical Gr/LFP 1C discharge simulation
▾
Graphite Anode (Ecker et al.) + typical LFP Cathode. 1C discharge rate corresponds to 1 A. |
50x50 + 30 + 50x50 | 3680 | 21:08:07 09/09/25 | 21:08:15 09/09/25 | Finished |
|
Typical Gr/NCA C/3 discharge
▾
This simulation was labeled as private. |
50x50 + 30 + 50x50 | 10218 | 15:52:06 08/09/25 | 15:52:15 08/09/25 | Finished |