Job "Mazumder battery 1C discharge - updated - restrict t_max" status: Finished

Description: Mazumder model validation: discharge at 1C over 3800s, timestep of 1s from 100% SOC. Fixed U_n AND U_p. Updated k0 (divided by the Faraday constant), surface area A, initial concentration in the electrolyte, input current. Note I use 1/2 of electrode area (since the actual number, 10452 cm^2, does not fit into the input field). I reduce the input current correspondingly (-3A instead of -6A). This will not affect the input current density which is I/A.

Job submitted: Thu, 02 Feb 2023 14:55:27 +0000

Job completed: Thu, 02 Feb 2023 14:55:51 +0000

Number of DAEs: 4420 (FV method)

Total (dis)charge time: 3800 s.

Maximum charge/discharge time limit tmax has been reached.




Simulation result preview:
Voltage and currents Concentrations and potentials Parameters



Download all simulation results:

data_and_plt_files.zip





The zip-file contains text data-files with the simulation results (voltages, currents, concentrations of Li ions, potentials) in a plain text format ready to be imported into any third-party post-processing software (e.g. Microsoft Excel, LibreOffice Calc, MATLAB, etc.).

In addition to the data-files, the zip contains text plt-files that can be used to produce publish ready plots in gnuplot.




➠ Review all parameters & Resubmit the simulation

This will create a new instance of the simulation parameters. The current simulation will be unaffected.